Request a fee proposal

Traffic & Transport

Waste Management Plans

A waste management plan shows how a development will store and collect waste — including safe access and manoeuvring for the collection vehicle — as required for a planning permit.

What it is

A waste management plan (WMP) sets out how a development will handle its waste: the bin storage, the collection method (council or private), the collection point, and — the part that makes it a traffic matter — how the waste-collection vehicle safely accesses, manoeuvres and services the site. Councils commonly require a WMP for multi-unit, commercial, mixed-use and industrial developments, and the collection-vehicle access is often the make-or-break detail.

When you need it

You need one where a council requires waste storage and collection to be documented — typically multi-dwelling residential, commercial, retail, mixed-use and industrial developments — and wherever waste collection involves a truck accessing the site or a specific on-street collection arrangement.

Who requires it

Councils require the WMP as part of planning approval; developers, architects, building designers and their planners commission it.

What Arcvia assesses

Waste generation and storage requirements for the use; the collection method and frequency; the collection vehicle and its access, manoeuvring and servicing (checked with swept-path analysis); the collection point and bin-presentation arrangements; safety and amenity; and compliance with the council's waste requirements.

What you receive

A waste management plan documenting storage, collection and vehicle access — with the supporting swept-path drawings for the collection vehicle — written to meet the council's requirements and to work in practice.

Standards, guidelines & authorities

Prepared with reference to the council's waste management guidelines and requirements, the relevant collection-vehicle dimensions, and AS 2890 for access and manoeuvring where relevant. Requirements vary by council, so we confirm the specific council's WMP requirements at scoping.

Information we need for your fee proposal

The site plan and proposed development/use; the number of dwellings or floor area; whether collection is council or private; the council; and your timeframe.

Our process

  1. Scoping — confirm the use, collection method and council requirements.
  2. Fee proposal — scope and fee in writing.
  3. Assessment — storage, collection and vehicle-access design (swept paths).
  4. Plan — prepare the WMP with supporting drawings.
  5. Support — respond to council questions.

Frequently asked questions

Related services

Sectors & locations

Servicing Victoria and Queensland.

Representative work

Have a project that needs a clear way forward?

Tell us about your development and we'll set out the scope and fee in writing.