Construction Traffic Management Plans (CTMP / TMP)

A construction traffic management plan sets out how traffic, pedestrians and site vehicles will be managed safely during building works — so your project stays compliant and keeps moving.

What it is

A construction traffic management plan is the document that shows how a construction project will manage its effect on the surrounding road and footpath network — deliveries and site access, pedestrian safety, parking and lane occupation, and staging — for the duration of the works. It is the plan councils and authorities rely on to be satisfied that the works won't create unsafe or unreasonable disruption. A quick note on terminology matters here (see the FAQ): “CTMP” is most common in New South Wales; in Victoria, construction-phase traffic is generally managed through a Traffic Management Plan (TMP), and the City of Melbourne uses a Construction Traffic Impact Assessment (CTIA) for major projects.

When you need it

You need one when construction will affect the public road or footpath network — occupying a lane or footpath, generating truck movements to and from site, requiring crane or concrete-pour set-downs, or changing pedestrian and cyclist movements around the site. It's commonly a condition of a planning permit, a building permit, or a road-occupation/works approval.

Who requires it

Local councils and road authorities require it as a condition of works that affect their network; builders, civil contractors, project managers and developers commission it to satisfy those conditions and to run the site safely.

What Arcvia assesses

Site access and haulage routes; delivery and set-down arrangements; lane, footpath and parking occupation; pedestrian and cyclist management; staging across the construction programme; and the safety and compliance measures needed at each stage. We design the plan to be practical on site, not just compliant on paper.

What you receive

A construction traffic management plan (or TMP/CTIA as your jurisdiction requires) with the supporting plans and staging, written to meet the authority's conditions and to be usable by the site team. Where the project also needs on-road traffic guidance detail, we scope that separately (see the FAQ).

Standards, guidelines & authorities

Plans are prepared with reference to the relevant framework for your jurisdiction — in Victoria, the Road Management Act 2004 and AS 1742.3 (Manual of uniform traffic control devices — Traffic control for works on roads), and the specific council's requirements (for example, the City of Melbourne's CTIA process); in Queensland, TMR's requirements and the relevant council conditions. We confirm the exact requirements for your site and authority at scoping (verified 2026-07-30).

Information we need for your fee proposal

The site address and the permit/approval conditions requiring the plan; the construction methodology or programme (even in outline); expected truck movements and any lane/footpath occupation; the relevant council/authority; and your timeframe.

Our process

  1. Scoping — confirm the authority's requirements and the works involved.
  2. Fee proposal — scope and fee in writing.
  3. Drafting — prepare the plan and staging with the construction team's input.
  4. Review — issue for your review and adjust.
  5. Finalisation & support — finalise for submission and respond to authority feedback.

Frequently asked questions

Related services

Sectors & locations

Servicing Victoria and Queensland.

Representative work

Have a project that needs a clear way forward?

Tell us about the works and the permit conditions, and we'll set out the scope and fee in writing.