Construction Traffic Management Plans (CTMP / TMP)
A construction traffic management plan sets out how traffic, pedestrians and site vehicles will be managed safely during building works — so your project stays compliant and keeps moving.
What it is
A construction traffic management plan is the document that shows how a construction project will manage its effect on the surrounding road and footpath network — deliveries and site access, pedestrian safety, parking and lane occupation, and staging — for the duration of the works. It is the plan councils and authorities rely on to be satisfied that the works won't create unsafe or unreasonable disruption. A quick note on terminology matters here (see the FAQ): “CTMP” is most common in New South Wales; in Victoria, construction-phase traffic is generally managed through a Traffic Management Plan (TMP), and the City of Melbourne uses a Construction Traffic Impact Assessment (CTIA) for major projects.
When you need it
You need one when construction will affect the public road or footpath network — occupying a lane or footpath, generating truck movements to and from site, requiring crane or concrete-pour set-downs, or changing pedestrian and cyclist movements around the site. It's commonly a condition of a planning permit, a building permit, or a road-occupation/works approval.
Who requires it
Local councils and road authorities require it as a condition of works that affect their network; builders, civil contractors, project managers and developers commission it to satisfy those conditions and to run the site safely.
What Arcvia assesses
Site access and haulage routes; delivery and set-down arrangements; lane, footpath and parking occupation; pedestrian and cyclist management; staging across the construction programme; and the safety and compliance measures needed at each stage. We design the plan to be practical on site, not just compliant on paper.
What you receive
A construction traffic management plan (or TMP/CTIA as your jurisdiction requires) with the supporting plans and staging, written to meet the authority's conditions and to be usable by the site team. Where the project also needs on-road traffic guidance detail, we scope that separately (see the FAQ).
Standards, guidelines & authorities
Plans are prepared with reference to the relevant framework for your jurisdiction — in Victoria, the Road Management Act 2004 and AS 1742.3 (Manual of uniform traffic control devices — Traffic control for works on roads), and the specific council's requirements (for example, the City of Melbourne's CTIA process); in Queensland, TMR's requirements and the relevant council conditions. We confirm the exact requirements for your site and authority at scoping (verified 2026-07-30).
Information we need for your fee proposal
The site address and the permit/approval conditions requiring the plan; the construction methodology or programme (even in outline); expected truck movements and any lane/footpath occupation; the relevant council/authority; and your timeframe.
Our process
- Scoping — confirm the authority's requirements and the works involved.
- Fee proposal — scope and fee in writing.
- Drafting — prepare the plan and staging with the construction team's input.
- Review — issue for your review and adjust.
- Finalisation & support — finalise for submission and respond to authority feedback.
Frequently asked questions
They're related but not interchangeable. A CTMP (Construction Traffic Management Plan) is the New South Wales term for the overall construction-traffic document; in Victoria the equivalent is generally a TMP (Traffic Management Plan) under the Road Management Act 2004; the City of Melbourne uses a CTIA (Construction Traffic Impact Assessment) for major works. A TGS (Traffic Guidance Scheme) is the detailed on-road, worksite signage-and-devices drawing prepared for actually setting up the site — a different, more granular document. We prepare the right document(s) for your jurisdiction and explain which you need.
If your construction will affect the public road or footpath — truck movements, lane or footpath closures, crane set-downs, altered pedestrian routes — you almost certainly do, and it's usually a permit condition. If all works and vehicle movements stay within your private site, you may not. We can confirm quickly.
Yes — the plan is built around your methodology and staging, so it reflects how the site will actually run. The more detail you can share on the programme and truck movements, the more useful and accurate the plan.
No. Arcvia is a traffic engineering and planning consultancy — we prepare the plans and the engineering behind them. We are not a traffic-control company and do not supply on-road crews, signage hire or equipment; where you need those, they're arranged separately by a traffic-control provider working to the plan.
Related services
- Haulage Management PlansA haulage management plan sets out how heavy-vehicle haulage — for a project, quarry, mine or major earthworks — will be routed and managed to protect safety and the road network.
- Line-Marking and Signage PlansLine-marking and signage plans set out the pavement markings and signs a car park, road or site needs to operate safely and comply with the standards.
- Swept-Path AnalysisSwept-path analysis uses vehicle-turning software to prove that the largest vehicles using your site can actually enter, manoeuvre and leave it safely.
- Traffic Impact Assessments (TIA)A traffic impact assessment is an engineering report that shows how a proposed development will affect the surrounding road network — and what, if anything, is needed to make it work safely.
Sectors & locations
Servicing Victoria and Queensland.
Representative work
Have a project that needs a clear way forward?
Tell us about the works and the permit conditions, and we'll set out the scope and fee in writing.